Which one of the following may be required from a local Authority prior to the installation of car charging equipment to the outside of a private property?
Which one of the following organisations should be consumed prior to the installation of electric vehicle charging equipment in a domestic property, by an installer who is not registered on a self-assessment scheme?
Which one of the following describes mode 1 charging?
Which one of the following describes mode 2 charging?
Which one of the following is a disadvantage of Mode 4 charging equipment.
Which of the following best describes a case A charging connection?
Which one of the following is a type 2 vehicle inlet and plug also known as?
Which one of the following protective devices, incorporated in charging equipment, provides both residual cunent (earth leakage) protection and overload protection?
If the electric vehicle charging equipment is to be installed in a guaranteed TN-S system which one of the following is true?
Which one of the following is responsible for determining that an existing supply is adequate for additional charging equipment loads?
Which one of the following locations is likely to require planning consent?
When is a TN-S system treated as a TN-C-S system?
A client who lives on the upper floor of a high rise residential block requires charging equipment to be installed in a basement garage area. Which one of the following should permission be sought from?
Which one of the following is a likely hazard if charging equipment is located too far from the vehicle inlet?
Which one of the following is an acceptable method of preventing electric vehicle charging equipment becoming live due to an open circuit neutral in a TN-C-S earthing arrangement?
Which one of the following earthing arrangements is shown in the diagram?
Which one of the following earthing arrangements is shown in the diagram?
An existing electrical installation forms part of a TT earthing arrangement. Which one of the following statements is true regarding the earthing arrangement and location of the charging equipment to be installed?
Prior to the installation of charging equipment, a survey reveals that water installation pipework is not connected by a main protective bonding conductor within a TN-S installation. Which one of the following actions should be taken?
Diversity may be applied to vehicle charging equipment circuits providing that the equipment is
Which one of the following diversity ratings should be applied to charging equipment without any automatic limit controls.
Electric vehicle charging equipment must be
Which one of the following describes the purpose of supplementary bonding between exposed extraneous parts?
Which one of the following describes Basic Protection?
When a 30 mA RCD is tested at X5, it must disconnect in
On an electric vehicle charging installation, which of the following methods of shock protection would also require the use of a 30 mA RCD?
RCD operation and test labels must indicate that an RCD should be tested every
Which one of the following should be fitted on or adjacent to a device used for isolating charging equipment?
Which one of the following details relating to the supply must be given on an Electrical lnstallation Certificate?
Which one of the following descriptions relating to the extent of an Electrical lnstallation Certificate would be ticked if charging equipment was installed using a dedicated new circuit?
During inspection, the presence of an earthing conductor must be verified. Which one of the following would satisfy this?
Which one of the following outcomes would verify, by inspection, that basic protection is suitable?
Which one of the following should results of prospective fault current test be compared with?
Which one of the following test currents must be applied to a 30mA RCD to confirm correct operation when fitted to electric vehicle charging equipment?
Which one of the following is the maximum disconnection time for a charging circuit, rated at 16 A, when forming part of a TN-S system within an attached garage?
Which one of the following tests should be conducted first when carrying out an initial verification of a newly installed charging equipment supply circuit?
Which one of the following would be completed and handed to the client on completion of a new circuit supplying charging equipment?
Which one of the following would be completed and handed to the client on completion of works which involved replacing or moving an existing charging post?
Which one of the following components should a client be instructed to self test at regular intervals?
Which one of the following is contained on a DNO notification form?