0 of 40 Questions completed
Questions:
You have already completed the quiz before. Hence you can not start it again.
You must sign in or sign up to start the quiz.
You must first complete the following:
Quiz complete. Results are being recorded.
0 of 40 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0 )
Earned Point(s): 0 of 0 , (0 )
0 Essay(s) Pending (Possible Point(s): 0 )
Show Question
1
Show Question
2
Show Question
3
Show Question
4
Show Question
5
Show Question
6
Show Question
7
Show Question
8
Show Question
9
Show Question
10
Show Question
11
Show Question
12
Show Question
13
Show Question
14
Show Question
15
Show Question
16
Show Question
17
Show Question
18
Show Question
19
Show Question
20
Show Question
21
Show Question
22
Show Question
23
Show Question
24
Show Question
25
Show Question
26
Show Question
27
Show Question
28
Show Question
29
Show Question
30
Show Question
31
Show Question
32
Show Question
33
Show Question
34
Show Question
35
Show Question
36
Show Question
37
Show Question
38
Show Question
39
Show Question
40
Review
Answered
Correct
Incorrect
Question 1 of 40
Which one of the following may be required from a local Authority prior to the installation of car charging equipment to the outside of a private property?
Question 2 of 40
Which one of the following organisations should be consumed prior to the installation of electric vehicle charging equipment in a domestic property, by an installer who is not registered on a self-assessment scheme?
Question 3 of 40
Which one of the following describes mode 1 charging?
Question 4 of 40
Which one of the following describes mode 2 charging?
Question 5 of 40
Which one of the following is a disadvantage of Mode 4 charging equipment.
Question 6 of 40
Which of the following best describes a case A charging connection?
Question 7 of 40
Which one of the following is a type 2 vehicle inlet and plug also known as?
Question 8 of 40
Which one of the following protective devices, incorporated in charging equipment, provides both residual cunent (earth leakage) protection and overload protection?
Question 9 of 40
If the electric vehicle charging equipment is to be installed in a guaranteed TN-S system which one of the following is true?
Question 10 of 40
Which one of the following is responsible for determining that an existing supply is adequate for additional charging equipment loads?
Question 11 of 40
Which one of the following locations is likely to require planning consent?
Question 12 of 40
When is a TN-S system treated as a TN-C-S system?
Question 13 of 40
A client who lives on the upper floor of a high rise residential block requires charging equipment to be installed in a basement garage area. Which one of the following should permission be sought from?
Question 14 of 40
Which one of the following is a likely hazard if charging equipment is located too far from the vehicle inlet?
Question 15 of 40
Which one of the following is an acceptable method of preventing electric vehicle charging equipment becoming live due to an open circuit neutral in a TN-C-S earthing arrangement?
Question 16 of 40
Which one of the following earthing arrangements is shown in the diagram?
Question 17 of 40
Which one of the following earthing arrangements is shown in the diagram?
Question 18 of 40
An existing electrical installation forms part of a TT earthing arrangement. Which one of the following statements is true regarding the earthing arrangement and location of the charging equipment to be installed?
Question 19 of 40
Prior to the installation of charging equipment, a survey reveals that water installation pipework is not connected by a main protective bonding conductor within a TN-S installation. Which one of the following actions should be taken?
Question 20 of 40
Diversity may be applied to vehicle charging equipment circuits providing that the equipment is
Question 21 of 40
Which one of the following diversity ratings should be applied to charging equipment without any automatic limit controls.
Question 22 of 40
Electric vehicle charging equipment must be
Question 23 of 40
Which one of the following describes the purpose of supplementary bonding between exposed extraneous parts?
Question 24 of 40
Which one of the following describes Basic Protection?
Question 25 of 40
When a 30 mA RCD is tested at X5, it must disconnect in
Question 26 of 40
On an electric vehicle charging installation, which of the following methods of shock protection would also require the use of a 30 mA RCD?
Question 27 of 40
RCD operation and test labels must indicate that an RCD should be tested every
Question 28 of 40
Which one of the following should be fitted on or adjacent to a device used for isolating charging equipment?
Question 29 of 40
Which one of the following details relating to the supply must be given on an Electrical lnstallation Certificate?
Question 30 of 40
Which one of the following descriptions relating to the extent of an Electrical lnstallation Certificate would be ticked if charging equipment was installed using a dedicated new circuit?
Question 31 of 40
During inspection, the presence of an earthing conductor must be verified. Which one of the following would satisfy this?
Question 32 of 40
Which one of the following outcomes would verify, by inspection, that basic protection is suitable?
Question 33 of 40
Which one of the following should results of prospective fault current test be compared with?
Question 34 of 40
Which one of the following test currents must be applied to a 30mA RCD to confirm correct operation when fitted to electric vehicle charging equipment?
Question 35 of 40
Which one of the following is the maximum disconnection time for a charging circuit, rated at 16 A, when forming part of a TN-S system within an attached garage?
Question 36 of 40
Which one of the following tests should be conducted first when carrying out an initial verification of a newly installed charging equipment supply circuit?
Question 37 of 40
Which one of the following would be completed and handed to the client on completion of a new circuit supplying charging equipment?
Question 38 of 40
Which one of the following would be completed and handed to the client on completion of works which involved replacing or moving an existing charging post?
Question 39 of 40
Which one of the following components should a client be instructed to self test at regular intervals?
Question 40 of 40
Which one of the following is contained on a DNO notification form?