When an inspector is setting inspection and testing samples, what is a major consideration?
What factor could have an impact on the limitations agreed with a client?
A local Authority require a periodic inspection and testing of a private building, what would be the common reason for this to be done?
‘Working on or near live parts’ is covered under Regulation 14 of the Electricity at Work Regulation, what does it state under this regulation?
How should the means of isolation be secured where by four persons are inspecting a large installation?
When code a defect which of the following is an example of a C1 classification code?
The second number of an IP code relates to which type of protection?
Where the use of an RCD is provided for fault protection only, what would be the maximum setting of the residual current?
Under what circumstances would remove the need for a ring-final continuity test during periodic testing?
Questions 17 – 21 relate to the following scenario
There is a continuity test to be conducted on the main protective bonding conductor within a large industrial installation. The gas installation pipe work, water pipe work and steel framework of the building have all separately run conductors connected to the MET. Each conductor is concealed at various parts along their run. All connection to the extraneous conductive parts are remote from the MET.
The conductors are disconnected from the MET for which of the following reasons?
Questions 17 – 21 relate to the following scenario
There is a continuity test to be conducted on the main protective bonding conductor within a large industrial installation. The gas installation pipe work, water pipe work and steel framework of the building have all separately run conductors connected to the MET. Each conductor is concealed at various parts along their run. All connection to the extraneous conductive parts are remote from the MET.
Before the conductor can be disconnected from the MET, what needs to take place?
Questions 17 – 21 relate to the following scenario
There is a continuity test to be conducted on the main protective bonding conductor within a large industrial installation. The gas installation pipe work, water pipe work and steel framework of the building have all separately run conductors connected to the MET. Each conductor is concealed at various parts along their run. All connection to the extraneous conductive parts are remote from the MET.
If the conductor to the gas pipe was 10mm2 and the length of the cable was approximately 27m. What would be the expected reading when tested on the pipe work after the clamp?
Questions 17 – 21 relate to the following scenario
There is a continuity test to be conducted on the main protective bonding conductor within a large industrial installation. The gas installation pipe work, water pipe work and steel framework of the building have all separately run conductors connected to the MET. Each conductor is concealed at various parts along their run. All connection to the extraneous conductive parts are remote from the MET.
Which of the following instruments would be used to carry out this test?
Questions 17 – 21 relate to the following scenario
There is a continuity test to be conducted on the main protective bonding conductor within a large industrial installation. The gas installation pipe work, water pipe work and steel framework of the building have all separately run conductors connected to the MET. Each conductor is concealed at various parts along their run. All connection to the extraneous conductive parts are remote from the MET.
What additional items would be required for this test and the considerations needed for this item?
When testing an RCD to BS EN 61008 at 1 x I∆N what would be the maximum permitted disconnection time?
When carrying out an external earth fault loop impedance test what must be disconnected?
The maximum permitted value of voltage drop for a 230V power circuit would be which one of the following values?
What would be checked by visual inspection to verify that Additional Protection is suitably provided by an RCD?
If the Main Protective Bonding Conductor cannot be seen throughout its length what should be undertaken?
When is it acceptable to enter a cross against any item detailed within the schedule of inspection for new works?
How would a non-compliance be recorded on an inspection schedule during a periodic inspection?
What would generally be the most common reason for crackling/arching sound coming from an existing lighting switch?
What would be verified using the sense of touch during an initial verification?
What code would be given where access to a room is limited and the inspector suspects corrosion to a bonding clamp?
What classification code would be used when discovering a severely damaged switch fused connection unit?
What IP rating is suitable for jets of water from any direction?
Where a horizontal top surface of a distribution board has a rating of IP4X, what diameter of wire should not be able to penetrate that barrier/enclosure.
Which one of the following tests does not require GS38 compliant leads?
Which of the below is a suitable method of testing the function of an insulation resistance tester?
Which particular test below can also be used to confirm polarity of a circuit?
Voltage drop is verified using which one of the following methods?