0 of 5 Questions completed
Questions:
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
0 of 5 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
You must ensure the Main switch is locked off and safely isolated for this test
The highest value of PSCC and PEFC is to be recorded as your PFC. What does PSCC and PEFC stand for?
The main earth must be reconnected for the PFC test to include parallel paths
When testing PFC on the AM2 what do you do to the highest value before we record it?
What is the maximum Ze value for a TN-C-S system?