0 of 10 Questions completed
Questions:
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
0 of 10 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
An electrician is performing the inspection and testing of the completed wiring of a new building. What must be checked before performing the insulation resistance test?
When inspecting a switch plate the inspector noticed that the twin and CPC cable had been used with the blue insulation not flagged with brown-oversheathing. This would have a non-compliance code of;
Which of the following requirements from GS38 applies to test equipment which requires more than one test lead?
How many items are listed on the EIC Schedule of Inspections?
Which of the following classifications would give an installation an overall assessment of Unsatisfactory?
What can IP2X also be recongnised as?
Which sense would be used to identify components not adequatley fixed?
What IP rating should equipment and accessories be if installed in Zone 0 of a bathroom?
You have conducted an initial ‘walk round’ survey and establish and initial sample size required. You carry out an inspection and test based on the initial sample size and get intermediate / poor results, what would you do?
How often should a Routine check be carried out on Hospitals and medical clinics (Medical Locations) and what is the maximum period between inspections and testing respectively?