0 of 5 Questions completed
Questions:
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
0 of 5 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
What is the maximum tripping time for an RCBO BSEN 61009 tested on X1?
The Functional test on an RCD must be done before using the instrument and then every 6 months
When testing Phase sequence on a 3ph DB or the load side of a motor, the correct sequence will be indicated by an arrow rotating in what direction?
The 2 way switches do not need checking for correct function as this was checked through dead testing, True of False?
Which of the following is not a functional test?