One end of the Equipotential Bonding conductor and the Supplementary Bonding conductor need disconnecting, before testing the continuity using the long lead method
What do you record on the Schedule of Test Results after obtaining the values of Step 1 of the Ring Final Continuity?
To check the value’s of Step 2 of the Ring Final Continuity test, the calculation r1 + r2 / 4 is used
A 2.5mm/1.5mm (Twin/CPC) cable is used for a ring final circuit. What factor would you apply to the r1 value to calculate the expected value of r2?
When completing the R1 + R2 Continuity test on a radial circuit, a link is placed between Line and CPC at the board. Where and what would you test between to obtain your highest R1 + R2 value?